Do you work on both low- and medium-voltage projects?

Yes. We design and build everything from final circuits in a flat to 34.5 kV transformer substations, including MV cells, transformers and main LV distribution.

Which regions do you cover?

Our teams work nationwide. For large projects we set up a site office; maintenance and measurement services are offered within a 150 km radius of our offices.

How do the survey and quote work?

We arrange the site survey with you at a time that suits you. Small jobs are quoted after the survey; for larger projects we prepare a detailed quote based on a bill of quantities.

What warranty do you give on your work?

We provide a 2-year warranty on workmanship and panels built in our workshop; equipment carries the manufacturer’s warranty. Maintenance contracts can extend coverage.

Can you work while our building or factory stays in operation?

Yes. Most preparation is done with the existing system live, and the short switchover is scheduled at night, at weekends or during planned maintenance stops.

Electrical Project Design (LV / MV)1

Do you handle the approval process with the distribution company?

Yes. We prepare the application documents, submit the project, answer revision requests and follow it until approval — and, if we also build the installation, through to energisation.

Lighting Design & LED Retrofit1

How quickly does an LED retrofit pay for itself?

In factories and warehouses that operate in shifts, payback is typically 12–30 months. Adding presence and daylight control shortens it further. Our energy audit gives you a figure before you decide.

EV Charging Station Installation1

Can my apartment building support several EV chargers?

Often yes. With dynamic load management the chargers share the available capacity and slow down automatically at peak times, so a new connection is frequently unnecessary. We confirm this with a measurement on site.

Maintenance, Grounding & Insulation Measurements1

How often must grounding be measured in a workplace?

In most workplaces grounding and electrical installations must be inspected at least once a year, and after any significant change. We can schedule these checks automatically under a maintenance contract.